Yes, as long as the existing substructure is free of damage or decay, and the joists are spaced in accordance with COOWIN Decking Installation Instructions, to ensure good ventilation and drainage.

LEAVE A MESSAGE

    We'll contact you within 24 hours. Check out the spam box in case that the mail is blocked.